News 2008
January February March April May June July August September October November December
|
11/2008 - Atlanta - New VIB MoistrueTech for the US
Acucote Inc. in Graham, NC has ordered a new VIB MoistureTech system to replace an existing steambox. The new MoistureTech is complete with moisture control, Control StationECSplus8 will be supervised with an Operator Workstation.
10/2008 - Frankfurt - New Qualitek Control System for Sweden
Smurfit Kappa in Eslφv has ordered new Qualitek Control System including bridge control and synchronized splicing for 5 splicers. The system is complete with PLC controls and will run through an operator work station with touch screen monitor. It also includes the score board display for easy monitoring the production of the corrugator.
10/2008 - Frankfurt - 3 new Steam & Condensate Upgrades for Germany
Mochenwangen Papier GmbH has ordered an upgrade for their steam & condensate system including new spoiler bars for the dryers of PM 3. Papier- und Kartonfabrik Varel GmbH & Co. KG has ordered an upgrade for their steam & condensate system for their KM 3 and KM 2. All systems are for energy savings and better control of the existing machines. |
10/2008 - Frankfurt - New VIB MoistureTech and 2 DOX Surface Systems for South Europe
Non disclosed customer has ordered a MoistureTech system for their PM for moisture and curl control. The system gets a new control station ECS+8 for automated moisture control. Further the machine will be equipped with two DOX surface cleaning systems for dust removal on the running web.
09/2008 - Frankfurt - New VIB AirTechPlus 6 for Brazil
International Paper has ordered for their Tres Lagoas paper mill in Brazil a new VIB AirTechPlus 6 system. The system is complete with Integrated Process Station (IPS) for CD moisture control and will be installed in a new Voith fine paper machine at that site.
09/2008 - Frankfurt - New VIB WaterTechPC+ for Ukraine
Rubezhnoye Cardboard & Package Mill in Rubezhnoye has ordered an upgrade for their WaterTech PC system. The system will be connected to the measurement system for moisture control with 150 mm wide control zones. |





