Technology News

News 2008 - February

January February March April May June July August September October November December

02/2008 - Frankfurt - New VIB AirTechPlus 6 for Sweden

Stora Enso Fors has ordered for their board machine no. 2 a new VIB AirTechPlus 6 system. This special micro drop spray system is for moisture control in front of the online calender. The system will be controlled through the Integrated Process Station (IPS). The unit is connected with the QCS system of the machine.

02/2008 - Frankfurt - New VIB SteamTechSC for Spain

Europac Duenas has ordered a new VIB SteamTech for their PM 2. This steamshower is for high resolution moisture control with 100 mm zone width and will be integrated into the existing VIB Integrated Process Station (IPS).


VIB Systems GmbH • Am Kreuzstein 80 • 63477 Maintal • Germany • Phone: +49 6109 606-0 • Fax: +49 6109 606-160

VIB Systems, Inc. • 4661-A Hammermill Road • Tucker, GA 30084 • USA • Phone: +1 770 491 8981 • Fax: +1 770 934 5716

Qualitek VIB • 4661-A Hammermill Road • Tucker, GA 30084 • USA • Phone: +1 770 543 0180 • Fax: +1 770 543 0181